Presentation of the project

Runtime

33 months

End date of realization

02/07/2015

Subdivision and construction of a residential complex in the basement and R + 6 - FEZ

Luxury housing project

  • Roads, Sanitation and various networks (Drinking water, telephone, electricity and fire protection)
  • Buildings construction
  • Secondary prizes: Sealing, thermal insulation, sound insulation, floor tiles and walls, Plastering, Suspended ceilings, wooden joinery, aluminum joinery, painting
  • Technical lots: Sanitary plumbing and drainage, heating, air conditioning, electricity, telephone, computer networks, Fire Protection, Fire Detection
  • Landscaping: Planting sprinkler system, peripheral Sidewalk, Terraces of furnishings, Outdoor lighting