Presentation of the project
End date of realization
11/01/2016
Construction of a factory braids and embroidery RAS EL MA - FEZ
Industrial Project
-
Construction of buildings reinforced concrete structure with big slabs worn..
-
Secondary prizes: Sealing, thermal insulation, sound insulation, floor tiles and walls, Plastering, Suspended ceilings, wooden joinery, aluminum joinery, painting
-
Technical lots: Sanitary plumbing and drainage, heating, air conditioning, electricity, telephone, computer networks, Fire Protection, Fire Detection, Transformer station
-
Industrial coating