Presentation of the project

Runtime

18 months

End date of realization

11/01/2016

Construction of a factory braids and embroidery RAS EL MA - FEZ

Industrial Project

  • Construction of buildings reinforced concrete structure with big slabs worn..
  • Secondary prizes: Sealing, thermal insulation, sound insulation, floor tiles and walls, Plastering, Suspended ceilings, wooden joinery, aluminum joinery, painting
  • Technical lots: Sanitary plumbing and drainage, heating, air conditioning, electricity, telephone, computer networks, Fire Protection, Fire Detection, Transformer station
  • Industrial coating

Gallery

TOP
EnglishFrench