Presentation of the project

Runtime

24 months

End date of realization

In process

Subdivision and construction of an office building and a hotel residence in R + 8 - FEZ

Touristic project

  • Roads, Draining, Transformer station, Generator and various networks (drinking water supply, telephone, electricity and fire protection)
  • Buildings construction
  • Secondary prizes: Waterproofing, Thermal insulation, sound insulation, floor tiles and walls, Plastering, Suspended ceilings, wooden joinery, aluminum joinery, metal joinery, painting
  • Technical lots: Sanitary plumbing and drainage, Drainage, Fire Protection, Fire Detection, Electricity, Lighting, Telephone Networks, Computer Networks, Remote Monitoring, PA-projection video conferencing, Intrusion, Fire detection system, Air conditioning, controlled mechanical ventilation, smoke extraction, Elevator
  • Landscaping: Closing Wall, Plantation sprinkler system, Platform, device Sidewalk, Terraces of furnishings, Outdoor lighting

Gallery

TOP
EnglishFrench